Decontamination, Demolition and Remediation of Plating Facility


Site:
Former Cast Plate Facility
Performance Period:
September 2013 - November 2014
Contract Amount:
$25,700,000

Picture
Phase I: Decontamination & Above Ground Demolition
  • High profile above-ground decontamination and demolition project on a 27-acre parcel with 17 acres under building
  • Decon over 5 million SF surface area including all horizontal and vertical surfaces (e.g., roof trusses, ventilation ducting, ceilings, walls, slabs, and subsurface collection systems)
  • Removal, transportation and disposal of over 1,500 tons of low level radioactive waste (Radium 226) to an NRC permitted disposal facility in Idaho
Phase I, Continued
  • Other wastes included ACBM, galbestos sidings, heavy metal impacted dust, impacted structural metals which could not be decontaminated, universal waste items and impacted electrical gears
  • Extremely aggressive seven month schedule which we surpassed, completing the SOW in five months.
  • Strict health and safety standards applied to all site activities
Picture
Picture
Phase II: Below-ground Demolition and Remediation
  • Vast array of waste streams
  • Demolition of contaminated subsurface structures
  • Excavation, transportation and disposal of PCB impacted soil, concrete and water
  • Full time, onsite concrete crusher 
  • Backfilling and compaction of subsurface structures
  • Worked with multiple local, State and Federal agencies, including EPA and DTSC
  • SWPPP development and implementation in accordance with RWQCB​
Complete Case Study
Home
About
Services
Case Studies
Careers
Contact
Safety
News & Events
Employees Only
© COPYRIGHT 2018. ALL RIGHTS RESERVED.
  • Home
  • About
  • Services
  • Case Studies
  • News & Events
  • Careers
  • Contact