888-423-6060​
American Integrated Services, Inc.
  • Home
  • About
    • Our Team
    • Safety
    • Equipment
    • Markets & Clients
    • Testimonials
  • Services
    • Environmental Remediation & Construction
    • Industrial Demolition & Abatement
    • Specialty Transportation
    • Waste Management
    • Industrial Services
    • Emergency & Disaster Response
    • Civil Construction
  • Case Studies
  • News & Events
  • Careers
  • Contact
  • Home
  • About
    • Our Team
    • Safety
    • Equipment
    • Markets & Clients
    • Testimonials
  • Services
    • Environmental Remediation & Construction
    • Industrial Demolition & Abatement
    • Specialty Transportation
    • Waste Management
    • Industrial Services
    • Emergency & Disaster Response
    • Civil Construction
  • Case Studies
  • News & Events
  • Careers
  • Contact

Decontamination of Styrene Manufacturing Plant


Site:
Former Styrene Manufacturing Plant
Contract Value:
$5,342,095

Picture
Scope of Work:
  • Completely encapsulate the processing train using scaffolding systems, HAKI truss roofing and shrink-wrap methods.
  • Establish 24-hour negative air-pressure within the containment, using multiple negative air machines on each floor throughout the train.
  • Asbestos abatement of friable insulation of two styrene vessels utilized as blow down tanks. Multiple elbows and pipes containing TSI were abated throughout the train.
  • Sandblast all previously painted piping and structural steel to a nearly white finish using a copper slag to minimize waste. Collect waste with industrial HEPA vacuum directed loading into bins at a dump rate of once every 10 seconds
  • Wash down entire structure to eliminate any blasting residuals. Capture all waste water for sampling and appropriate disposal
  • Employ dehumidifiers to eliminate moisture and prevent rusting of blasted steel prior to priming.
Picture
Picture
  • Restoration of all insulation and paint to original specifications
  • Installation of custom sump and hook-up to existing storm drain system
  • Completed work in allotted time of five months using two crews, twenty four hours a day, six days a week for a  total of 23,000 man hours from start to finish.